Outdoor Dining Room Part 2

It was another busy week around here! We made lots of progress although the changes weren't as dramatic as last week. The room is painted, the electrical is complete, the new wall in the garage is sheet-rocked and painted, ​cabinets have been assembled, and the floor installed and sealed. Here are some pictures.

The garage is shaping up. Next week it gets a fresh coat of paint and the floor will get a coat of epoxy.​

The concrete ended up being too uneven and stained to use, so we had these limestone floors installed. They're amazing!​

We still have to hang the chandelier and the fan​, build the banquette, and install the railing, and do some touch up painting. It should be 1-2 days more until the room is finished, then I get to decorate!

I'll keep you posted.​

Lynn​